  The World’s Longest Bridge

  Rumor has it that1 a legendary six-headed monster lurks in the deep waters of the Tyrrhenian Sea between Italy and the island of Sicily. 1

  When completed in 2010, the world’s longest bridge will weigh nearly 300,000 tons equivalent to the iceberg that sank the Titanic — and stretch 5 kilomerers long. “that’s nearly 50 percent longer than any other bridge ever built,” says structural engineer Shane Rixon. 2

  They’re suspension bridges, massive structures built to span vast water channels or gorges. A suspension bridge needs just two towers to shoulder the structure’s mammothweight, thanks to hefty supporting cables slung between the towers and anchored firmly in deep pools of cement at each end of the bridge. The Messina Strait Bridge will have two 54,00-ton towers, which will support most of the bridge’s load. The beefy cables of the bridge, each 1.2 meter in diameter, will hold up the longest and widest bridge deck ever built. When construction begins on the Messina Strait Bridge in 2005, the first job will be to erect two 370 meter-tall steel towers. 3

  Getting these cables up will be something2. It’s not just their length — totally 5.3 kilometers — but their weight. 4

  After lowering vertical “suspender” cables from the main cables, builders will erect a 60meter-wide 54,630-ton steel roadway, or deck — wide enough to accommodate 12 lanes of traffic. The deck’s weight will pull down on the cables with a force of 70,500 tons. In return, the cables yank up against their firmly rooted anchors with a force of 139,000 tons — equivalent to the weight of about 100,000 cars. Those anchors are essential. 5

  A Some environmentalists are against the project on biological grounds.

  B What do the world’s longest bridges have in common?

  C If true, one day you might spy the beast while zipping (呼啸而过) across the Messina Strait Bridge.

  D They’re what will keep the bridge from going anywhere.

  E The second job will be to pull two sets of steel cables across the strait, each set being a bundle of 44,352 individual steel wires.

  F They will tip up the scales at 166,500 tons — more than-half the bridge’ s total mass.

  答案与题解:

  1. C 选项 C 中有一个关键词 beast,与第一句的 monster 相呼应。所以, C 是正确答 案。

  2. B 第二段第二句的主语是 They。由于表语是 suspension bridges,They 替代的一 定是前面句子出现过的 bridges。六个选项中,只有 B 含有 bridges。填在第三段段首, 意思连贯。

  3. E“空 3”前面的句子有 the first job 这几个词。有 first,必有 second/then。 六个选项中只有 E 含有 The second job。所以,E 是答案。

  4. F “空 4”前面的句子说的是,把这些吊索吊高定位是有难度的,不仅仅由于它们 很长,还由于它们很重。 F 具体地介绍了它们的重量,应该是“空 4”前面的句子的后续 句。

  5. D “空 5”前面的句子说的是,桥桩很重要。为什么很重要呢? D 解释了桥桩的作 用,意义连贯,所以是答案。

猜你喜欢

  • 听力
  • 口语
  • 阅读
  • 娱乐
  • 词汇
  • 写作

            版权及免责声明

            凡本网注明"稿件来源:新东方"的所有文字、图片和音视频稿件,版权均属新东方教育科技集团(含本网和新东方网) 所有,任何媒体、网站或个人未经本网协议授权不得转载、链接、转贴或以其他任何方式复制、发表。已经本网协议授权的媒体、网站,在下载使用时必须注明"稿件来源:新东方",违者本网将依法追究法律责任。

            本网未注明"稿件来源:新东方"的文/图等稿件均为转载稿,本网转载仅基于传递更多信息之目的,并不意味着赞同转载稿的观点或证实其内容的真实性。如其他媒体、网站或个人从本网下载使用,必须保留本网注明的"稿件来源",并自负版权等法律责任。如擅自篡改为"稿件来源:新东方",本网将依法追究法律责任。

            如本网转载稿涉及版权等问题,请作者见稿后在两周内速来电与新东方网联系,电话:010-60908555。

            热搜关键词